IDENTIFICATION
Plant Coding
For complete and accurate identification of plant components one
requires correct base documentation and system boundaries. The
content of the documentation will always be the responsibility of
the system engineer but each coding technician (mechanical,
electrical and Control) is responsible for the coding on all base
documentation. No item can be coded unless it appears on the base
documentation.
Base documentation:
- Piping and Instrumentation Diagrams
- Process flow diagrams
- Mechanical flow diagrams
- Electrical board general arrangement
- Cable schedule
- Cable block diagram
- Line diagrams
- Control desk layouts
- Equipment room cubicle layouts
Plant coding is done for all three disciplines and certain
principles need to be adhered to:
- Apply coding principles.
- Document site specific decisions.
- Apply standards for plant descriptions.
- Capture all information in the database.
Classification
Each plant item identified can be classified according to the
plant and site requirements.
Identification Documentation
This includes a technical data package that accurately describes
the functional and physical characteristics of the plant.
Documentation included is: engineering, operating and maintenance
documentation, All documentation is identified and linked to the
unique plant component.
Plant Labeling
To complete the identification part of Configuration Management,
each component needs to be physically identified in the plant. This
is the process of plant labeling. A site specific specification will
be created and used.
CONFIGURATION CONTROL
This is a continued function that manages changes to the
baseline. This is the management of Modifications. The key
performance areas are the accuracy of the documentation to the
as-built status of the plant.
Modification Approval
The co-ordination and approval or disapproval of proposed changes
to the plant design.
Registration and Classification of Modifications
Each Modification must be registered in the database and
classified.
Modification Documentation and Tracking
Ensuring that the changed plant is correctly and accurately
described by the corresponding documentation. Ensuring all required
documents are revised as needed and all new documents are obtained,
registered and linked to the correct plant component.
Modification Package
A detailed design procedure will specify minimum requirements
that need to be met.
CONFIGURATION REPORTING
Management reporting as required.
CONFIGURATION ACCOUNTING
Continuous auditing to verify information reflects the as-built
status of the plant and reporting to show status of plant at any
time.
Ennead Consulting has been contracted as the configuration
management contractor at Camden Power Station and Grootvlei Power
Station. Both of these old moth-balled power stations are undergoing
refurbishent for return to service. These are monumental projects
the configuration data will be monumental in the success of the
projects. Duties included in the projects are:
- Training – principles and concepts.
- Development of custom business processes i.e.
- Plant Walkdowns,
- Codification,
- Modifications,
- System Audits,
- Documentation Control etc.
- Implementation of processes.
- Resources supplied to manage and run the system
|